Crowhurst Embankment Stabilisation

17 April 2019

Work identified by Network Rail off-track engineers at Waterloo to repair and stabilise Crowhurst Embankment. 

Water pressure trapped within the embankment was relieved by blind drilling at random intervals and angles up under the 4ft on both sides. They then drilled right through the embankment, pulling in a 160mm pipe to run the tie rods through tying the embankment together for a long-term solution.

Download PDF

More case studies

Haweswater Aqueduct

17 September 2024

MGS Rhino Corebox helps ground investigation for the Haweswater Aqueduct Resilience Programme

read more

Comberton College

18 June 2024

MGS products help heat Comberton College with ground source heat exchange system

read more

Kingston Lacy

5 March 2024

MGS Thermo-Loops® help 17th century National Trust property embrace 21st century sustainability.

read more

REGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929