+44 (0)1359 271167
Back to case studies

Guildford Station

17 April 2019

TerraDrain 17, 250mm, was installed as the main 6ft collector drain and 250mm TerraLine 17 was used as the carrier cross drain to alleviate the retained water in the sub layer and to move it to the London end out fall. 

Download PDF

More case studies

Comberton College

18 June 2024

MGS products help heat Comberton College with ground source heat exchange system

read more

Kingston Lacy

5 March 2024

MGS Thermo-Loops® help 17th century National Trust property embrace 21st century sustainability.

read more

The TransPennine Route Upgrade

12 February 2024

Demco (a brand of MGS Ltd) helped specify, prove, manufacture & supply TerraDrain™ and TerraLine™ products to improve Track & line-side drainage at Morley Station near Leeds.

read more

REGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929