Botley Station, Oxford

17 April 2019

The modelling of the S&C at Botley Station to incorporate a new track layouts and drainage system required 350m of 6ft collector drainage together with 24m of carrier drain UTX, 7 in line GRP  TerraPits and a 90 degree TerraPit. The installation ran towards Southampton from the platform turning to cross the track (right) under the S&C into the siding 10ft running to the out fall.

From order to completion of delivers was 4 weeks.

Download PDF

More case studies

Haweswater Aqueduct

17 September 2024

MGS Rhino Corebox helps ground investigation for the Haweswater Aqueduct Resilience Programme

read more

Comberton College

18 June 2024

MGS products help heat Comberton College with ground source heat exchange system

read more

Kingston Lacy

5 March 2024

MGS Thermo-Loops® help 17th century National Trust property embrace 21st century sustainability.

read more

REGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929