+44 (0)1359 271167
Back to case studies

Botley Station, Oxford

17 April 2019

The modelling of the S&C at Botley Station to incorporate a new track layouts and drainage system required 350m of 6ft collector drainage together with 24m of carrier drain UTX, 7 in line GRP  TerraPits and a 90 degree TerraPit. The installation ran towards Southampton from the platform turning to cross the track (right) under the S&C into the siding 10ft running to the out fall.

From order to completion of delivers was 4 weeks.

Download PDF

More case studies

Carstairs Rail Project, Glasgow

3 June 2020

MGS has supplied a Pagani TG63-150 for use in a large-scale infrastructure SI project near Glasgow to investigate a railway embankment up to 10m in height which had instability issues.

read more

TerraDrain installed at Bletchingley

10 March 2020

Demco’s specialist track drainage pipe TerraDrain 11 has been installed as part of upgrade works at Bletchingley Tunnel in Surrey. TerraDrain was used because it is approved for installation at

read more

Southampton Station

4 July 2019

The modelling of the S&C at Southampton Station to incorporate a new track layout and drainage system. The project required 200m of 6ft TerraDrain collector drainage together with 12m of

read more

REGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929