Ipswich Station

4 July 2019

Following the building of a new viaduct at Ipswich, new routes under the railway had to be found for Telecom’s & East Anglia Water mains. It was decided to use non-dig technology to drill and sleeve through the embankment 12m apart to enable both companies to get their supplies through.

A launch pit and reception pit had to be made ready, then Molegrove drilled through the embankment supporting each metre with a 560mm OD steel casing ensuring the track was supported at all times. The railway line remained open for traffic throughout the installation. 

Download PDF

More case studies

Kingston Lacy

5 March 2024

MGS Thermo-Loops® help 17th century National Trust property embrace 21st century sustainability.

read more

The TransPennine Route Upgrade

12 February 2024

Demco (a brand of MGS Ltd) helped specify, prove, manufacture & supply TerraDrain™ and TerraLine™ products to improve Track & line-side drainage at Morley Station near Leeds.

read more

One Horton Heath, Eastleigh

10 January 2024

MGS Thermo-Loops help deliver 100% renewable heat to 2,500 new homes. One Horton Heath in Eastleigh, Hampshire, is a 10-year development to build 2,500 new homes. Committed to using renewable

read more

REGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929