Ipswich Station

4 July 2019

Following the building of a new viaduct at Ipswich, new routes under the railway had to be found for Telecom’s & East Anglia Water mains. It was decided to use non-dig technology to drill and sleeve through the embankment 12m apart to enable both companies to get their supplies through.

A launch pit and reception pit had to be made ready, then Molegrove drilled through the embankment supporting each metre with a 560mm OD steel casing ensuring the track was supported at all times. The railway line remained open for traffic throughout the installation. 

Download PDF

More case studies

Haweswater Aqueduct

17 September 2024

MGS Rhino Corebox helps ground investigation for the Haweswater Aqueduct Resilience Programme

read more

Comberton College

18 June 2024

MGS products help heat Comberton College with ground source heat exchange system

read more

Kingston Lacy

5 March 2024

MGS Thermo-Loops® help 17th century National Trust property embrace 21st century sustainability.

read more

REGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929