Ore Tunnel
4 July 2019
Network Rail identified the requirement for a major upgrade of the railway between Hastings and Ashford. A 9-week blockade centred on essential maintenance works in the Ore Tunnel, the refurbishment to include water-proofing, strengthening and track alignment, complete with 864m of track drainage.