+44 (0)1359 271167

Case studies

The following case studies provide examples of projects in which MGS products have been used.

Crowhurst Embankment Stabilisation

17 April 2019

Work identified by Network Rail off-track engineers at Waterloo to repair and stabilise Crowhurst Embankment.  Water pressure trapped within the embankment was relieved by blind drilling at random intervals and

Download PDF

Botley Station, Oxford

17 April 2019

The modelling of the S&C at Botley Station to incorporate a new track layouts and drainage system required 350m of 6ft collector drainage together with 24m of carrier drain UTX,

Download PDF

REGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929