The project involved refurbishment of Scarborough Station, track layout and the track drainage system.
Work included Drainage run No.1: Cess drainage through Platform 5 from the outfall under the bus station car park out towards York, then cross drain to pick up the isolated 6ft drainage between the signal post and truck counter.
Drainage run No.2: A 6ft drain from the end of Platform 2 running away towards York to an outfall beyond the old signal box.