The project involved refurbishment of Scarborough Station, track layout and the track drainage system.

Work included Drainage run No.1: Cess drainage through Platform 5 from the outfall under the bus station car park out towards York, then cross drain to pick up the isolated 6ft drainage between the signal post and truck counter. 

Drainage run No.2:  A 6ft drain from the end of Platform 2 running away towards York to an outfall beyond the old signal box. 

Download PDF

More case studies

Haweswater Aqueduct

17 September 2024

MGS Rhino Corebox helps ground investigation for the Haweswater Aqueduct Resilience Programme

read more

Comberton College

18 June 2024

MGS products help heat Comberton College with ground source heat exchange system

read more

Kingston Lacy

5 March 2024

MGS Thermo-Loops® help 17th century National Trust property embrace 21st century sustainability.

read more

REGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929