Southampton Station

4 July 2019

The modelling of the S&C at Southampton Station to incorporate a new track layout and drainage system.

The project required 200m of 6ft TerraDrain collector drainage together with 12m of TerraLine carrier drain UTX, four in-line GRP TerraPits and three 90° Terrapits, one 90° narrow TerraPit and one narrow TerraPit in-line. 