MGS Technical Sales Engineer Chris White gives a demo using the MGS-sponsored Pagani TG 63-150 rig. The session was part of a training course on Cone Penetration Testing at Brunel University, London. The rig is permanently sited there for use in training and demonstrations. Chris showed CPTu testing and Seismic CPT tests using the Pagani seismic module.
Tube Lines (TFL) identified the Upminster depot as requiring major upgrade works to accommodate the new train stock. Refurbishment included the buildings, track layout, power, and drainage.
There were three main phases of track drainage totalling 1,434m of pipe.