The following case studies provide examples of projects in which MGS products have been used.

North London Line

4 July 2019

Network Rail identified the need for a major upgrade of the railway to support goods’ movement from the docks through North London out to the regions. It covered three miles

Download PDF

Kings Cross Remodelling Project

4 July 2019

Network Rail has started a multi-million pound programme into upgrading the East Coast Main Line as part of their rail upgrade plan.  As part of this programme, the infrastructure outside

Download PDF

Ipswich Station

4 July 2019

Following the building of a new viaduct at Ipswich, new routes under the railway had to be found for Telecom’s & East Anglia Water mains. It was decided to use

Download PDF

Guildford Station

17 April 2019

TerraDrain 17, 250mm, was installed as the main 6ft collector drain and 250mm TerraLine 17 was used as the carrier cross drain to alleviate the retained water in the sub

Download PDF

Ealing & Upminster Station

17 April 2019

Tube Lines (TFL) identified the Upminster depot as requiring major upgrade works to accommodate the new train stock. Refurbishment included the buildings, track layout, power, and drainage. There were three