The following case studies provide examples of projects in which MGS products have been used.

Southampton Station

4 July 2019

The modelling of the S&C at Southampton Station to incorporate a new track layout and drainage system. The project required 200m of 6ft TerraDrain collector drainage together with 12m of

Download PDF

Scarborough Station

4 July 2019

The project involved refurbishment of Scarborough Station, track layout and the track drainage system. Work included Drainage run No.1: Cess drainage through Platform 5 from the outfall under the bus station

Download PDF

Ore Tunnel

4 July 2019

Network Rail identified the requirement for a major upgrade of the railway between Hastings and Ashford. A 9-week blockade centred on essential maintenance works in the Ore Tunnel, the refurbishment

Download PDF

North London Line

4 July 2019

Network Rail identified the need for a major upgrade of the railway to support goods’ movement from the docks through North London out to the regions. It covered three miles

Download PDF

Kings Cross Remodelling Project

4 July 2019

Network Rail has started a multi-million pound programme into upgrading the East Coast Main Line as part of their rail upgrade plan.  As part of this programme, the infrastructure outside

Download PDF