Ealing & Upminster Station
17 April 2019
Tube Lines (TFL) identified the Upminster depot as requiring major upgrade works to accommodate the new train stock. Refurbishment included the buildings, track layout, power, and drainage.
There were three main phases of track drainage totalling 1,434m of pipe.