+44 (0)1359 271167
Back to case studies

Ealing & Upminster Station

17 April 2019

Tube Lines (TFL) identified the Upminster depot as requiring major upgrade works to accommodate the new train stock. Refurbishment included the buildings, track layout, power, and drainage.

There were three main phases of track drainage totalling 1,434m of pipe.

Download PDF

More case studies

Haweswater Aqueduct

17 September 2024

MGS Rhino Corebox helps ground investigation for the Haweswater Aqueduct Resilience Programme

read more

Comberton College

18 June 2024

MGS products help heat Comberton College with ground source heat exchange system

read more

Kingston Lacy

5 March 2024

MGS Thermo-Loops® help 17th century National Trust property embrace 21st century sustainability.

read more

REGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929