North London Line

4 July 2019

Network Rail identified the need for a major upgrade of the railway to support goods’ movement from the docks through North London out to the regions. It covered three miles of track enhancement through the east & west catchment areas of the London Overground Railway Network between South Acton to Barking. 

As part of this upgrade 3066m of track drainage very shallow installations in the 6ft, 10ft & cess & Thames sewer works were required through this challenging area. All to be installed within the 18 month blockade. 

Download PDF

More case studies

Carstairs Rail Project, Glasgow

3 June 2020

MGS has supplied a Pagani TG63-150 for use in a large-scale infrastructure SI project near Glasgow to investigate a railway embankment up to 10m in height which had instability issues.

read more

TerraDrain installed at Bletchingley

10 March 2020

Demco’s specialist track drainage pipe TerraDrain 11 has been installed as part of upgrade works at Bletchingley Tunnel in Surrey. TerraDrain was used because it is approved for installation at

read more

Southampton Station

4 July 2019

The modelling of the S&C at Southampton Station to incorporate a new track layout and drainage system. The project required 200m of 6ft TerraDrain collector drainage together with 12m of

read more

REGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929