North London Line
4 July 2019
Network Rail identified the need for a major upgrade of the railway to support goods’ movement from the docks through North London out to the regions. It covered three miles of track enhancement through the east & west catchment areas of the London Overground Railway Network between South Acton to Barking.
As part of this upgrade 3066m of track drainage very shallow installations in the 6ft, 10ft & cess & Thames sewer works were required through this challenging area. All to be installed within the 18 month blockade.