Case studies
The following case studies provide examples of projects in which MGS products have been used.
The following case studies provide examples of projects in which MGS products have been used.
4 July 2019
Network Rail identified the need for a major upgrade of the railway to support goods’ movement from the docks through North London out to the regions. It covered three miles
Download PDF4 July 2019
Network Rail has started a multi-million pound programme into upgrading the East Coast Main Line as part of their rail upgrade plan. As part of this programme, the infrastructure outside
Download PDF4 July 2019
Following the building of a new viaduct at Ipswich, new routes under the railway had to be found for Telecom’s & East Anglia Water mains. It was decided to use
Download PDF17 April 2019
TerraDrain 17, 250mm, was installed as the main 6ft collector drain and 250mm TerraLine 17 was used as the carrier cross drain to alleviate the retained water in the sub
Download PDF17 April 2019
Tube Lines (TFL) identified the Upminster depot as requiring major upgrade works to accommodate the new train stock. Refurbishment included the buildings, track layout, power, and drainage. There were three
Download PDFREGISTERED OFFICE: Geotechnical Centre, Rougham Industrial Estate, Rougham, Bury St Edmunds, Suffolk IP30 9ND. Registered in England: 2481929